Projects
Continuous ash disposal facility Phase 1
Main contractor:
Concor
Duration:
22 Months
Cost:
Equipment:
Installation of 250mm and 450mm HDPE pipe lines
Pressure rating: PN16
Manufacture and Installation of 500NB steel pipes and gate valves
Hydro pressure testing of the pipe lines
2023 © Waterkon Installations (Pty) Ltd . All rights reserved. | Powered by Visual Projects