Majuba Power Station

Projects

Majuba
Power Station

Continuous ash disposal facility Phase 1

Volksrust

Main contractor:

  • Concor

Duration:

  • 22 Months

Cost:

  • R3.8 Million
Volksrust

Equipment:

  • Installation of 250mm and 450mm HDPE pipe lines

  • Pressure rating: PN16

  • Manufacture and Installation of 500NB steel pipes and gate valves

  • Hydro pressure testing of the pipe lines