Majuba Power Station

Water Industry Specialist

Projects

Majuba
Power Station

Continuous ash disposal facility Phase 1

Volksrust

Main contractor:

  • Concor

Duration:

  • 22 Months
Volksrust

Equipment:

  • Installation of 250mm and 450mm HDPE pipe lines.

  • Pressure Rating: PN16.

  • Manufacture and Installation of 500NB steel pipes and gate valves.

  • Hydro pressure testing of the pipe lines.