Nacala Dam

Projects

Nacala Dam

Supply, installation and commissioning of all
Hydro Mechanical equipment including a pipe bridge (84 meter long X 12 meter high)

Main contractor:

  • WBHO Mozambique

Duration:

  • 12 Months

Cost:

  • R5.5 Million

Equipment:

  • 800NB pipe with walkway on top including hand railing.
  • Sleeve valves.
  • Diffuser installation.
  • Isolating valve.
  • Sundry steel works.